Liner plate
The grass hopper method
Ammonia dynamite
All the above
Firing of head holes is done just before the bench holes are fired
Removal of muck from the heading is very easy
Tunneling can be continuous and the work can be expedited
Placement of concrete lining
450 particles/cm3
None the above
Horizontal down or up holes
Austrian method
Cast iron
Excavation being done along the periphery
Rock terrain