Q.

The work study is done by means of

  • APlanning chart
  • BProcess chart
  • CStop watch
  • DAny one of these
Correct Answer : (C)

Stop watch

Hints :
Previous

In break-even analysis, total cost consists of

Next

The most popular type of organisation used for Civil Engineering Constructions is

Join The Discussion